1. What Job Methods is for
Everyday work often contains details that nobody has questioned for a long time: walking to collect packaging, recording the same information twice or checking something later than necessary. JM creates a disciplined way to examine those details with the people who do the job.
The aim is a better method, not simply asking a person to work faster. Start by understanding the actual sequence, including handling, movement, inspection and processing. Observe enough normal work to see the method rather than an unusual demonstration prepared for a visitor.
2. The four steps of TWI Job Methods
- Break down the job. Record the details of the current method.
- Question every detail. Examine its purpose, location, sequence, person and means.
- Develop the new method. Consider eliminating unnecessary details, combining or rearranging work and simplifying what remains.
- Apply the new method. Explain the proposal, obtain the necessary agreement, introduce it and follow up.
The sequence matters. If you jump straight to a favourite solution, you may optimise an activity that could be removed or miss a constraint experienced by the next process.
3. Questions that make observation useful
| Question | What to investigate at the workplace |
|---|---|
| Why is it necessary? | The purpose of the detail and what would happen without it. |
| Where should it happen? | The position of people, material, tools and information. |
| When should it happen? | The order of activities and dependencies. |
| Who should do it? | The required competence and responsibility. |
| How should it be done? | The method, movement, equipment and information needed. |
Ask these questions to understand the work, not to challenge an operator personally. A sensible-looking action may compensate for a problem elsewhere in the process. Find that reason before proposing a change.
4. Example: preparing packaging materials
Illustrative situation: an operator leaves the packing station several times to collect the same carton and label types. A JM observation records each collection and the order in which materials are used.
The team asks whether repeated trips are needed, whether materials can be prepared together and whether storage can be located closer to use. A possible trial is a clearly defined replenishment point with the required materials presented in sequence.
Before accepting the change, check variant identification, replenishment responsibility, ergonomics and the effect on the upstream process. Compare the trial with the original method using actual observations. Do not claim a saving until the team has measured it and checked that work has not merely moved to somebody else.
5. Turn an improvement into a maintained standard
Record the agreed method and why it changed. Involve the responsible people in approval, then update affected instructions, visual examples and training plans. Use TWI Job Instruction where people need to learn the revised task.
Follow up after introduction. Ask whether the method works across shifts and product variants, whether expected results are visible and whether any new difficulty has appeared. A practical improvement remains open to further learning.
6. Common mistakes
- Improving from memory instead of observing the job.
- Counting only processing time and ignoring movement or handling.
- Presenting a solution before understanding the purpose of each detail.
- Changing a method without involving people affected by it.
- Leaving the old instruction in use after a successful trial.
7. Where eTWI supports the improvement
Use eTWI to document the agreed new instruction, route it for approval and maintain the revision history. Photos, video and company-specific templates can help explain the changed method at the workplace.
JM is the improvement method used by the team. eTWI supports its documented outcome and the connection to instruction-based training; it does not replace observation, judgement or an improvement discussion.
8. Frequently asked questions
How does JM differ from JI?
JM helps improve the method of work. JI helps teach the agreed method. They work together when an improvement changes how a task should be performed.
Does JM require new equipment?
The programme starts by looking for better use of existing resources. Some findings may justify investment, but buying equipment is not the starting assumption.
Who should take part?
Include the people doing the work and the roles responsible for the process. Involve other functions when the proposal affects quality, safety, maintenance or another team.
9. Sources and related guides
Reference material checked on 23 November 2026. Examples in this guide are illustrative.